A Concept for Safe and Less Expensive Acceleration of a Marine Steam Turbine Start-up

Info

Title:
A Concept for Safe and Less Expensive Acceleration of a Marine Steam Turbine Start-up
Author(s):
Affilations:
Author(s):
Mateusz Bryk1 Jerzy G?uch2
1 Energy Conversion Department, The Szewalski Institute of FluidFlow-Machinery PAS, Gdańsk 80-231, Poland;
2 Department of Control and Power Engineering, Faculty of Mechanical Engineering and Ship Technology, Gdansk University of Technology, Gdańsk, Poland
Keywords:
Marine steam turbine start-upUltra-fast start-upThermal stressRelative elongationsFuel savingsEnergy management
分类号:
-
DOI:
10.1007/s11804-023-00337-7
Abstract:
This paper analyses the issue of accelerated start-up of a marine steam turbine, which is an important problem because the start-up of a steam machine involves the combustion of fuel that is not transformed into useful energy. To find novel technologies that offer improvements in this aspect is essential due to restrictions on reducing ship emissions. Thus, the shorter the start-up time, the better for the environment and economy. High-pressure (HP) part of the turbine originally located on the Queen Elizabeth II unit was analysed. Advanced numerical calculations by thermal fluid-solid-interaction (Thermal FSI) were carried out. A series of simulations were performed for the accelerated start-up with controlled steam injection. A description of the chosen calculation methodology and the results obtained by simulation are included in this paper. The stress occurring during the accelerated start-up are approximately 40 MPa higher than those during the reference start-up. The relative elongations between the rotor and the hull during accelerated start-up reach a maximum value of 0.89 mm (0.83 mm for ultra-fast start-up). Reducing the steam turbine start-up time by 75% results in a 36.7 tons reduction in fuel consumption for start-up, resulting in an annual savings of 5 372 USD. In conclusion, the concept proposed by the authors is safe, less expensive and does not affect the life of the turbine. In addition, results and applications from Siemens prove that additional injection of cooling steam is possible.

References:

Armellini A, Daniotti S, Pinamonti P, Reini M (2019) Reducing the environmental impact of large cruise ships by the adoption of complex cogenerative/trigenerative energy systems.Energy Conversion and Management 198.https://doi.org/10.1016/j.enconman.2019.111806
Arrel D (2006) Next Generation Engineered Materials for Ultra Supercritical Steam Turbines.Final Technical Report, Siemens Orlando
Badur J (2005) Five lectures of contemporary fluid termomechanics.Gdansk, Poland (in Polish)
Badur J, S?awinski D, Kornet S, Kowalczyk T, Bryk M, Zio?kowski PJ, Stajnke M, Zio?kowski P (2016) Overdesign limitations from the maintaining availability of large steam turbine.Energetyka 11:652-654
Badur J, Bryk M (2019) Accelerated start-up of the steam turbine by means of controlled cooling steam injection.Energy 173:1242-1255.https://doi.org/10.1016/j.energy.2019.02.088
Balcombe P, Brierley J, Lewis C, Skatvedt L, Speirs J, Hawkes A, Staffell A (2019) How to decarbonise international shipping:Options for fuels, technologies and policies.Energy Conversion and Management 182:72-88.https://doi.org/10.1016/j.enconman.2018.12.080
Banaszkiewicz M (2015) Multilevel approach to lifetime assessment of steam turbines.International Journal of Fatigue 73:39-47.https://doi.org/10.1016/j.ijfatigue.2014.10.009
Banaszkiewicz M, Dudda W, Badur J (2019) The effect of strength differential on material effort and life-time of steam turbine rotors under thermo-mechanical load.Engineering Transactions 67:167-184.https://doi.org/10.24423/EngTrans.964.20190426
Bryk M, Kowalczyk T, Zió?kowski P, Badur J (2019) The thermal effort during marine steam turbine flooding with water.AIP Conference Proceedings 2077.https://doi.org/10.1063/1.5091870
Casella F, Pretolani F (2006) Fast Start-up of a Combined-Cycle Power Plant:a Simulation Study with Modelica.Modelica 2006, September.https://doi.org/10.1063/1.5091870
COATS R.Marine Engineering Practice Vol 1, Part 8, Marine Steam Turbines, The Institute Of Marine Engineers
Domachowski Z, Dzida M (2004) An analysis of characteristics of ship gas turbine propulsion system (in the light of the requirements for ship operation in the Baltic Sea).Pol Marit Res 73-78 (Special Issue)
International Gas Union 2021 world LNG report:Technical report 2021
Dominiczak K, Drosińska-Kmor M, Rz?dkowski R, G?uch J (2020) Optimisation of turbine shaft heating process under steam turbine run-up conditions.Archives of Thermodynamics 41:255-268.https://doi.org/10.24425/ather.2020.135863
Dotto A, Campora U, Satta F (2021) Feasibility study of an integrated COGES-DF engine power plant in LNG propulsion for a cruiseferry.Energy Conversion and Management 245.https://doi.org/10.1016/j.enconman.2021.114602
Dudda W, Banaszkiewicz M, Zió?kowski PJ (2019) Validation of a Burzyński plasticity model with hardening-a case of St12T.AIP Conference Proceedings 2077.https://doi.org/10.1063/1.5091877
G?uch J, Drosińska-Komor M (2021) Neural Modelling of Steam Turbine Control Stage, Studies in Systems.Decision and Control 313:117-128.https://doi.org/10.1007/978-3-030-58964-6
Haglind F (2008a) A review on the use of gas and steam turbine combined cycles as prime movers for large ships.Part I:Background and design.Energy Conversion and Management 49:3458-3467.https://doi.org/10.1016/j.enconman.2008.08.005
Haglind F (2008b) A review on the use of gas and steam turbine combined cycles as prime movers for large ships.Part II:Previous work and implications.Energy Conversion and Management 49:3448-3475.https://doi.org/10.1016/j.enconman.2008.08.004
Haglind F (2008c) A review on the use of gas and steam turbine combined cycles as prime movers for large ships.Part III:Fuels and emissions.Energy Conversion and Management 49:3476-3482.https://doi.org/10.1016/j.enconman.2008.08.003.
Inomata A; Yamashita K; Saito K, Inukai T, Wada K, Ikeda K; Suga T (2014) Steam turbine, method of cooling steam turbine and heat insulating method for steam turbine.United States Patent US 8,727,705 B2, May 20
Ito M (2007) Development of Mitsubishi High Efficiency Marine Propulsion Plant (Ultra Steam Turbine).KANRIN (Bulletin of The Japan Society of Naval Architects and Ocean Engineers) 12:43.https://doi.org/10.1016/j.enconman.2018.12.080
Ji DM, Sun JQ, Dui Y, Ren JX (2017) The optimization of the startup scheduling for a 320 MW steam turbine.Energy 125:345-355.https://doi.org/10.1016/j.energy.2017.02.139
Ji DM, Sun JQ, Sun Q, Guo HC, Ren JX, Zhu QJ (2018) Optimization of start-up scheduling and life assessment for a steam turbine.Energy 160:19-32.https://doi.org/10.1016/j.energy.2018.07.015
Kehlhofer RH, Warner J, Nielsen H, Bachmann R (1999) Combinedcycle gas & steam turbine power plants.2nd ed.PennWell, Tulsa, OK
Kosman G, Rusin A (2001) The influence of the start-ups and cyclic loads of steam turbines conducted according to European standards on the component’s life.Energy 26:1083-1099.https://doi.org/10.1016/S0360-5442(01)00071-8
Kosman W, Roskosz M, Nawrat K (2009) Thermal elongations in steam turbines with welded rotors made of advanced materials at supercritical steam parameters.Applied Thermal Engineering 29.https://doi.org/10.1016/j.applthermaleng.2009.05.016
Kosman G, Rusin A, Taler J, Pawlik M (2010) Issues of design and operation of boilers and turbines for supercritical coal blocks.Gliwice:Publishing House of the Silesian University of Technology
Kowalczyk T, Badur J, Bryk M (2019) Energy and exergy analysis of hydrogen production combined with electric energy generation in a nuclear cogeneration cycle.Energy Conversion and Management 198.https://doi.org/10.1016/j.enconman.2019.111805
Madejski P, Taler D, Taler J (2016) Numerical model of a steam superheater with a complex shape of the tube cross section using Control Volume based Finite Element Method.Energy Conversion and Management 118:179-192.https://doi.org/10.1016/j.enconman.2016.03.069
Mosleh M, Banawan A, El-Maghlany WM, Mohamed AG (2012) Parametric Study of Marine Steam Turbine Plants.Engineering Research Journal 35:373-381.https://doi.org/10.21608/ERJM.2012.67196
Sinan Karakurt A, Ust Y (2011) Marine Steam Turbines, 1st International Symposium on Naval Architecture and Maritime INT-NAM, 24-25
October, Istanbul, Turkey Wieghardt K (2015) Siemens Steam Turbine Design for AD700 Power Plants.AD700 Conference Milan
Zhu S, Ma Z, Zhang K, Deng K (2020) Energy and exergy analysis of a novel steam injected turbocompounding system applied on the marine two-stroke diesel engine.Energy Conversion and Management 221.https://doi.org/10.1016/j.enconman.2020.113207
Zió?kowski P, Kowalczyk T, Lemański M, Badur J (2019) On energy, exergy, and environmental aspects of a combined gas-steam cycle for heat and power generation undergoing a process of retrofitting by steam injection.Energy Conversion and Management 192:374-384.https://doi.org/10.1016/j.enconman.2019.04.033
Zió?kowski PJ, Ochrymiuk T, Eremeyev VA (2021) Adaptation of the arbitrary Lagrange-Euler approach to fluid-solid interaction on an example of high velocity flow over thin platelet.Continuum Mechanics and Thermodynamicsm33:2301-2314.https://doi.org/10.1007/s00161-019-00850-7 https://www.classnk.or.jp/register/regships/one_dsp.aspx?imo=9245720

Memo

Memo:
Received date:2022-07-07;Accepted date:2023-01-12。
Corresponding author:Mateusz Bryk,E-mail:mbryk@imp.gda.pl
Last Update: 2023-06-02