|Table of Contents|

Citation:
 Xuanze Ju,Wei Fang,Hanjun Yin and Ying Jiang.Stress Analysis of the Subsea Dynamic Riser Base Process Piping[J].Journal of Marine Science and Application,2014,(3):327-332.[doi:10.1007/s11804-014-1264-8]
Click and Copy

Stress Analysis of the Subsea Dynamic Riser Base Process Piping

Info

Title:
Stress Analysis of the Subsea Dynamic Riser Base Process Piping
Author(s):
Xuanze Ju Wei Fang Hanjun Yin and Ying Jiang
Affilations:
Author(s):
Xuanze Ju Wei Fang Hanjun Yin and Ying Jiang
Offshore Oil Engineering Co., Ltd., Tianjin 300451, China
Keywords:
subsea product design subsea dynamic riser base (SDRB) process piping stress analysis flexible riser rigid pipeline
分类号:
-
DOI:
10.1007/s11804-014-1264-8
Abstract:
The subsea dynamic riser base(SDRB)is an important piece of equipment for the floating production platform mooring system.One end is connected to the rigid pipeline, carrying a rigid pipeline thermal expansion load and the other end is connected to a flexible riser, carrying the dynamic load of the flexible riser, so its function is a transition connection between the flexible riser and the rigid pipeline which fixes the flexible riser on the seabed. On the other hand,as a typical subsea product, the design will satisfythe requirements of the standards for subsea products. By studying the stress analysisphilosophy of the topside piping and subsea pipeline, a physical model and procedure for piping stress analysis of the SDRB have been established.The conditions of the adverse design load have been considered, and a combination of the static load from the rigid pipeline and the dynamic load flexibility has also been optimized. And a comparative analysis between the AMSE, DNV and API standards for piping stress with the checking rules has been done.Because theSDRB belongs to the subsea pipeline terminal product, the use of DNV standards to check its process piping stress is recommended. Finally, the process piping stress of the SDRB has been calculated, and the results show that the jacket pipe and the carrier pipe stress of the SDRB process piping satisfy the DNV standards as a whole.The bulkhead cannot be accurately simulated by the AutoPIPE software which uses the FEA software ANSYS inthe detailed analysis, but the checking results will still meet the requirements of the DNV standards.

References:

American Petroleum Institute (2009). Design, construction, operation, and maintenance of offshore hydrocarbon pipelines, recommended practice. API RP 1111, 12-18.
American Petroleum Institute (2009). Design of risers for floating production systems (FPSs) and tension-leg platforms (TLPs), recommended practice. API RP 2RD, 47-110.
American Society of Mechanical Engineers (2008). Process piping. American National Standard, ASME B31.3, 12-40.
American Society of Mechanical Engineers (2009). Pipeline transportation systems for liquid hydrocarbons and other liquids. American National Standard, ASME B31.4, 83-84.
American Society of Mechanical Engineers (2010). Gas transmission and distribution piping systems. American National Standard, ASME B31.8, 104-105.
Antaki GA (2003).Piping and pipeline engineering. Marcel Dekker Inc.,New York, 104~174.
Antani JK, Dick WT, Balch D, Van Der Leij T (2008). Fabrication and installation of the Neptune export lateral PLEMs.Offshore Technology Conference,Houston, USA, OTC 19688.
Bai Y, Bai Q (2005). Subsea pipelines and risers. Elsevier, Oxford, 497-508.
Bai Y, Bai Q(2010).Subsea engineering handbook. Elsevier, Oxford, 572-604.
Bernt T, Smedsrud E (2007). Ormen lange subsea production system. Offshore Technology Conference, Houston, USA, OTC 18965.
Chen Jinlong, Guo Hong, Qu Yan, Liu Xiaoyan, Yan Jun, Yue Qianjin, Tang Minggang(2011). Dynamic analysis of BTM mooring FPSO of subsea riser &cable system. The Fifteenth Session of China Ocean (Coast) Engineering Symposium, Beijing, 1, 117-121. (in Chinese)
Det Norske Veritas (2005). Submarine pipeline systems. Offshore Standard, DNV-OS-F101, 37-39.
Ellenberger JP (2014). Piping and pipeline calculations manual.Butterworth-Heinemann, Boston, 123-150.
Fang Xiaoming(2003).The installation of stp system of wenchang project.China Offshore Oil & Gas ( Engineering), 15(1), 1-11, 38, 60. (in Chinese)
International Organization for Standardization (2010). Petroleum and natural gas industries—Design and operation of subsea production systems—Part 15: Subsea structures and manifolds. International Standard, ISO 13628-15, 18.
Li Peng, Li Tong, Zhang Hongkai, Liu Zhenguo, Zhu Peng, Lan Qingshi (2010). Fexible riser in deep water FPSO.Shipbuilding of China, 51(Special 2), 378-385. (in Chinese)
Robinson R, Grass J (2003).Design chalhnges of a 48-inch pipeline subsea manifold. Offshore Technology Conference, Houston, USA, OTC l5275.
Robleto R,Williams J(2010).Efficiency and economy of automating displacements for FPSO pipe stress analysis.Offshore Technology Conference,Houston, USA, OTC 20868.
Schwarz MM(2004). Flexibility analysis of the vessel-piping interface.International Journal of Pressure Vessels and Piping,81, 2,181-189.
Triolo D, Mosness T, Jennings J, Rezende J (2010).Liwan gas project: First South China Sea deepwater completion campaign. Offshore Technology Conference,Houston, USA, OTC 23934.

Memo

Memo:
This work was financially supported by Offshore Engineering Equipment Scientific Research Project–Topic on Subsea Production System Design and Key Equipment Research & Development from Ministry of Industry and Information Technology of the People’s Republic ofChina E-0813C003.
Last Update: 2014-10-16