Chen Jiegui, Liu Cungen, Yang Xiaobo(2002). Shipbuilding production and logistics organization. Ship Engineering, 67(5), 69-71.
Hu Guanghua, Chen, Yuan Chuming, Zhou Zude (2007). Research on Inter-cell Layout Problem in CMS Using Intelligent Optimization Algorithm. Application Research of Computers, 24(6), 72-74.
Tie Jun (2007). The Theory and Algorithm of the Three-Dimensional Layout Optimization with Behavioral Constraints. Ph.D thesis, Dalian University of Technology, Dalian, 15-20.
Xu Li, Li Weifeng, Shi Zhihui (2004). Application Study of 3D Simulation Technology in the Design of Manufacturing Shop Layout. Machine Tool & Hydraulics, 42(8), 63-65.
Zhou Maotao, Wang Zhiwen, Liu Chang (2009). Summarization on Design Method for Layout of Machining Workshop and Example Analysis. Liuzhou Iron and Steel Technology, 21(2),37-40.
Du Quan, Ge Shilun, Ge Qingmeng (2009). Research of process optimization in shipbuilding shop based on method of shipbuilding facilities’ collocation optimization. Science Technology and Engineering, 9(1), 3367-3370.
Wu Zheng, Zhiming Wang(2005). 3D Industry Design. Beijing Chemistry Industry Publishing Corp, Beijing, China, 35-36.
Liu Yujun, Zheng Yuanyuan, Deng Yanping (2008). Steel material processing shop scheduling system modeling based on OOCPN. Marine Technology, 285(5), 29-32.
Zhong Hongcai, Jiang Ruhong, Tan Jiahua (2004). Specialized shipbuilding production of unit model and the optimization of schedule operation. Shipbuilding in China, 45 (2), 7-13.