|Table of Contents|

Citation:
 Hua Yuan,Yao Zhao and Jun Yan.Research on an Integrated Modeling Method of Virtual Ship Assembly[J].Journal of Marine Science and Application,2011,(4):447-455.[doi:10.1007/s11804-011-1090-1]
Click and Copy

Research on an Integrated Modeling Method of Virtual Ship Assembly

Info

Title:
Research on an Integrated Modeling Method of Virtual Ship Assembly
Author(s):
Hua Yuan Yao Zhao and Jun Yan
Affilations:
Author(s):
Hua Yuan Yao Zhao and Jun Yan
1. School of Naval Architecture and Ocean Engineering, Huazhong University of Science and Technology, Wuhan 430074, China 2. Technology Center of Wuchang Shipyard, Wuhan 430064, China
Keywords:
ship virtual assembly simulation modeling workflow model simulation database three-dimensional design construction planning
分类号:
-
DOI:
10.1007/s11804-011-1090-1
Abstract:
A new method of virtual ship assembly modeling which integrates ship three-dimensional design and ship construction planning was described in this paper. A workflow model of simulation modeling based on the virtual ship assembly process was also established; furthermore, a method of information transformation between the ship three-dimensional design and ship construction plan was formulated. To meet the requirements of information sharing between different systems in the ship virtual assembly, a simulation database was created by using the software engineering design method and the relational data model. With the application of this database, the information of ship three-dimensional design, construction planning, and virtual assembly can be integrated into one system. Subsequently, this new method was applied as a tool to simulate the virtual assembly of a ship, and the results guarantee its rationality and reliability.

References:

Kim HT, Lee JG, Lee SS (2003). A simulation based shipbuilding system for evaluation of validity in design and manufacturing. Proceedings of IEEE International Conference on Systems, Man and Cybernetics, Washington. DC, 522-529.
Lee JK, Lee KJ, Park HK (1997). Developing scheduling systems for DAEWOO shipbuilding: DAS project. European Journal of Operational Research, 97( 2), 380-395.
Li Jianhui, She Huaihua, Yan Baoping (2008). Semantic integration of relational database based on metadata. Computer Engineering, 34(6), 54-56.
Liu Yindong(2003). Shipyard process planning based on distributed expert system. Shipbuilding of China, 44(4), 1-4.
Liu Jiangsheng, Yao Yingxue, Li Jianguang (2004). Data transformation from CAD to virtual assembly system. Computer Integrated Manufacturing Systems, 10(S1), 56-59.
Ma Jianping, Zhou Xinjian, Pan Lei (2006). Delmia/QUEST-based digital assembly line simulation application. Journal of East China Jiaotong University, 23(2), 125-128.
Mclean C, Shao G (2001). Simulation of shipbuilding operations. Proceedings of the 2001 Winter Simulation Conference, Washington.DC, 870-876.
Wan Bile, Ning Ruxin, Liu Jianhua (2007). Architecture of cable harness and tube assembly planning system in virtual environment. Computer Integrated Manufacturing Systems, 13(8), 1579-1585.
Xu Aimin, Jin Ye (2007). Modeling of block erection process in shipyard based on sharing synthesis of timed Petri net. Computer Integrated Manufacturing Systems, 13(3), 465-471.
Yuan Hua, Zhao Yao, Yan Jun (2009a). Simulation system for ship assembly logistics. Journal of Huazhong University of Science and Technology(Nature Science Edition), 37(1), 53-56.
Yuan Hua, Zhao Yao, Yan Jun (2009b). Design of the system architecture of virtual manufacturing for shipbuilding and its key technology. Journal of Huazhong University of Science and Technology(Nature Science Edition), 37(4), 126-129.
Zha Binbin, Niu Zhanwen, Guo Wei (2007). The Multi-layer simulation analysis model in manufacturing process planning. Industrial Engineering and Management, 3, 89-94.
Zhao Ji, Xiao Tian-yuan, Han Xiang-li (2001). Computation model in manufacturing system virtual environment. Computer Integrated Manufacturing Systems, 7(11), 22-26.
Zhao Han, Liang Ping, Liu Mingzhou (2004). Research on mechanical and electronic product BOM by object-oriented database technique. Computer Integrated Manufacturing Systems, 10(12), 1537-1540.
Zhong Han, Liang Ping, Liu Mingzhou (2004). Research on cellular manufacturing model and production plan optimum in shipbuilding. Shipbuilding of China, 45(2), 7-13.

Memo

Memo:
Supported by Key National Science & Technology Specific Projects under Grant No. 2008ZX05027-005-002.
Last Update: 2011-11-25