Chiang TC, Fu LC (2009). Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times. European Journal of Operational Research, 196(1), 78-92.
Fredenall LD, Lea BR (1997). Improving the product mix heuristic in the theory of constraints. International Journal of Production Research, 35, 1535-1544.
Goldratt EM (1984). The Goal. North River Press, New York.
Goldratt EM (1990). What is this thing called Theory of constraints and how should it be implemented?. North River Press, New York.
Li R, K, Hamada,Shimozori T (2010). Development of a theory of constraints based scheduling system for ship piping production. Journal of Shanghai Jiaotong University (Science), 15(3), 354-362.
Mabin VJ, Balderstone S J (2003). The performance of the theory of constraints methodology: analysis and discussion of successful TOC applications. International Journal of Operations & Production Management, 23(6), 68-95.
Newbold RC (1998). Project management in the fast lane. Applying the theory of constraints. St. Lucie Press, Boca Raton, FL, USA.
Ozdamar L, Yazgac T (1997). Capacity driven due date settings in make-to-order production systems. International Journal of Production Economics, 49, 29-44.
Stephen FS,
Mark SF, Peng SO (1986). Construction and maintaining detailed production plans: investigations into the development of knowledge-based factory scheduling systems. AI Magazine, 7(4), 45-61.
Singh RK, Prakash A, Kumar S, Tiwari MK (2006). Psycho-clonal based approach to solve a TOC product mix decision problem. The International Journal of Advanced Manufacturing Technology, 29, 1194-1202.