|Table of Contents|

Citation:
 YUE Ji-xiang*,QI Yao-guang,XIAO Wen-sheng,et al.Study on the general layout of semi-submersible offshore drilling platforms based on process flow[J].Journal of Marine Science and Application,2009,(2):117-122.
Click and Copy

Study on the general layout of semi-submersible offshore drilling platforms based on process flow

Info

Title:
Study on the general layout of semi-submersible offshore drilling platforms based on process flow
Author(s):
YUE Ji-xiang* QI Yao-guang XIAO Wen-sheng YANG Lei and YANG Yi-pu
Affilations:
Author(s):
YUE Ji-xiang* QI Yao-guang XIAO Wen-sheng YANG Lei and YANG Yi-pu
College of Machinery and Electronic Engineering, China University of Petroleum (East China) Dongying 257061, China
Keywords:
semi-submersible drilling platform general layout drilling process flow layout optimization group technology
分类号:
-
DOI:
-
Abstract:
The general layout of 6th generation semi-submersible drilling platforms is the main factor impacting the efficiency of their drilling operations. This paper provides a compound/integrated algorithm based on process flow that is aimed at improving efficiency, while giving attention to stability and safety at the same time. The paper describes the process flow of dual drilling centers and a hierarchical division of rigs based on the different modes of transportation of various drilling support systems. The general layout-centripetal overall arrangement spatially was determined based on drilling efficiency. We derived our modules according to drilling functionality; the modules became our basic layout units. We applied different layout algorithm to mark out the upper and lower decks. That is, the upper deck was designed based on the lowest transportation cost while the lower deck’s calculations were based on the best-fit scope. Storage configurations in columns and pontoons were also considered for the layout design. Finally the center of gravity was taken into consideration and the general layout was adjusted accordingly, to result in an optimal center of gravity. The methodology of the general layout can provide a reference for implementation of domestic designs of semi-submersible rigs.

References:

[1] YUE Jixiang, Qi Yaoguang, Ren Xuhu. Study on the Driller Cabin of Semi-submersible Offshore Drilling Platform Based on Human Factors Engineering[J]. China Offshore Platform. 2008, 23(2): 7-12.
 [2] CHEN Xinquan. Research on Preliminary Design of Deepwater Semi-submersible[D]. Shanghai: Shanghai Jiao Tong University, 2007: 23-26.
 [3] YUE Jixiang, QI Yaoguang, XIAO Wensheng, et al. Study on Configuration and Layout about Drilling Material Transportation System of Semi-submersible Drilling Platform[J]. Ship & Ocean Engineering. 2008, 5: 31-36.
[4] LIU Haixia. General Arrangement of Deep Sea Semi-submersible drilling unit[J]. China Offshore Platform, 2007, 22(3): 7-12.
[5] YUE Jixiang, QI Yaoguang, XIAO Wensheng, et al. Study on the drill floor layout of semi-submersible drilling platform[J]. Journal of China University of Petroleum (Edition of Natural Science), 2008, 6: 113-117.
 [6] CB-Z319-1982. Transport ship weight classify and center of gravity calculation[S].

Memo

Memo:
-
Last Update: 2010-04-23